Videos | Case | News | About Us | Download | FAQ | Become Dealers | Contact Us
Views: 0 Author: Site Editor Publish Time: 2023-05-29 Origin: Site
With the development of society, as the financial center of Asia, Hong Kong Airport can’t meet the current needs of people any more, the expansion of Terminal 2 is urgent to be built.
Our company focus on customized metal sheet processing, steel structure production and development for many years. We have accumulated rich experiences for our production management team, laying a solid foundation for the curtain wall and wall steel structure part of this project.
As it is an airport project, considering the high level requirements of safety, durability, anti-corrosion, seismic resistance, etc., Party A has conducted multiple inspections and in-depth exchanges with us, to reach an agreement on quality requirements, material standards, production processes, engineering progress, project promotion, packaging and transportation, acceptance standards, after-sales service, etc. The final contract was signed and our company specifically established a new factory for this project.
After three months of preparation work, all the equipment has been arrived,the preliminary work has been basically completed. The project was officially started from October 2021. All materials were provided by Wugan Iron and Steel Corporation designated by Party A, meeting the high-level requirements of airport safety, durability, anti-corrosion, and seismic resistance.
The biggest problem encountered in the project is welding. Party A requires all welding to meet European standards and obtain a European standard welder certificate. Our company has trained more than 10 senior welders holding European standards to meet the requirements, all the welding process and welding points are inspected by a third-party testing company.All products must undergo welding flaw detection testing to ensure that the welding position of the entire product is solid and reliable.
At present, half of this project has been completed, all goods are transported directly to Hong Kong Airport by truck after completion, and then assembled directly after passing the on-site inspection.
This project is still ongoing, our products and services have received unanimous support from our customers. Therefore, we are continuing to produce new customized metal product projects. Our management team has also accumulated rich project management experiences, laying the foundation for our further development in the field of customized metal sheet metal processing and steel structures.